RFQ checklist
LED mirror RFQ checklist for faster project review.
Use this checklist before submitting a MIVEQ RFQ so sales, engineering, production, quality, and packaging teams can review the same project scope.
Buyer Requirements
Built around practical sourcing decisions.
The strongest RFQs connect product configuration with quantity, destination, packaging, labels, files, and sample expectations. This reduces clarification loops before quotation.
Before quotation
- Do not submit only a product photo if the project requires custom size or compliance notes.
- Separate unknown items as TBD instead of leaving fields blank.
- Attach drawings or room schedules when model variants need to be separated.
- State sample and bulk production timelines separately.
Typical Scope
Common programs and applications.
These examples connect the search term with real mirror sourcing work, not generic product browsing.
RFQ Inputs
What to send for a faster review.
A complete package helps MIVEQ review manufacturing, sampling, quality, packaging, and delivery requirements before pricing.
- Prepare drawings, images, quantity, dimensions, lighting type, CCT, and control method.
- Add anti-fog, frame finish, mounting, packaging, destination, and buyer-owned requirement notes.
- Include private-label, label, instruction, barcode, and carton requirements when relevant.
- Submit through the RFQ page or email the RFQ desk with a clear project name.
FAQ
Common RFQ questions.
Use these answers to prepare a clearer mirror sourcing request before sample or production review.
Can I submit an incomplete RFQ?
Yes, but marking unknown items as TBD is more useful than leaving important fields empty.
Do I need drawings?
Drawings are strongly recommended for custom sizes, room schedules, installation details, or repeat production programs.
RFQ First
Ready to specify a project?
Send drawings, quantities, dimensions, compliance notes, delivery targets, and packaging requirements. MIVEQ will review the project scope and respond with next steps.